Jump Main Menu. Go directly to the main content

Sección de utilidades

Fin de la sección de utilidades

Sección de idiomas

Fin de la sección de idiomas

You are in:

  1. Post-tensioning operations in building works

Portal / Post-tensioning operations in building works

Start of main content

The use of Post-Tensioning Operations in Building Works offers the following advantages:

  • Costs savings
  • Greater open spaces
  • Greater distance between pillars
  • Smaller top slab edges
  • Less Joints
  • Control of deflections
  • Smaller foundation structures
  • Greater durability

Tecpresa has carried out the post-tensioning operations of many top slabs in different types of special projects and buildings:

  • Shopping Centres
  • Hotels
  • Theatres
  • Conference Centres
  • Train Stations
  • Airports
  • Universities

Tecpresa has used different solutions in these projects, such as its non-adherent single-strand systems, its 31 0.6 tendons or 4 0.6 units with plain duct.

End of main content

  • Start of content